The five-yearly inverter test, measured to the second.

The measurement

A van with the ACT Inverter Testing logo parked in the driveway of a Canberra home with rooftop solar.An electrician taking a reading at a residential switchboard.An electrician turning an inverter's isolator back on, a clamp meter hanging from its AC cable reading 0.00 A.An electrician handing a homeowner the completed declaration at the front door.

Measured at the inverter main switch

EXPORTINGNOT EXPORTINGMain switch opensMains restored2 sMaximum disconnect time60 sMinimum reconnect delay

Cease within two seconds.
Hold off past sixty.

Islanding is where an inverter keeps supplying power into the distribution network during an outage, leaving a live section of an otherwise de-energised network. Evoenergy describes it as a serious safety issue for its personnel working on the network and for private electrical contractors working inside the property, one that could lead to injury or death. It also interferes with network power quality and can damage equipment and appliances.

Evoenergy

on what islanding is, and why it matters

Evoenergy, Periodic inverter testing (FAQ)

The procedure

Four measurements, and the paperwork that records them

A clamp meter around the AC cable below a wall-mounted inverter, reading 0.00 A.
Test 1a · Every installation

Ceases supply within two seconds

The inverter main switch is turned off. The time taken for the inverter to stop attempting to export is measured with a timing device, using a voltage probe on the installation side of the switch.

An electrician turning an inverter's isolator back on, a clamp meter hanging from its AC cable reading 0.00 A.
Test 1b · Every installation

Holds off for more than 60 seconds

Mains are restored and the time taken for the inverter to resume supply is measured, using a current probe on the installation side of the switch to detect the moment export recommences.

An electrician switching off the backup main switch beside a home battery and inverter, a timing instrument in his other hand reading 1.42 seconds.
Test 2a · Battery systems with a backup main switch

Backup system ceases supply within two seconds

The backup main switch is turned off and the same cease-supply measurement is taken for the backup system.

An electrician crouched beside a home battery, watching a clamp meter on the inverter's cable read 0.00 A while the backup system holds off.
Test 2b · Battery systems with a backup main switch

Backup system holds off for more than 60 seconds

The backup system's resume time is measured after the installation is re-energised.

The approach

01 / 04

Send the reminder

Photograph the Evoenergy notice and tell us your suburb. We confirm what is on site, how many inverters, and whether there is a battery with a backup main switch.

02 / 04

Book for daylight

A PV test is only valid while the system is producing more than 20 per cent of the rated output of the array or the inverter, whichever is less, so we book a slot with the weather and the time of day on our side.

03 / 04

Test on site

Inverter main switch off, cease time measured. Mains restored, resume time measured. Battery systems that have a separate backup main switch get the backup tests as well.

04 / 04

Lodge and hand over

We complete the declaration on site and copy it. The original stays with us, you keep a copy, and a copy is emailed to Evoenergy at distribution@evoenergy.com.au.

Battery systems: what we tell you before we start

Turning off the backup main switch can de-energise backup loads, depending on the battery's charge level and on whether there is a fault in the battery system. Evoenergy's procedure requires us to explain that risk before we start and to proceed only with your consent. In most cases backup circuits stay energised throughout.

Evoenergy, Periodic inverter testing procedure

Book a test

A photograph of the notice is enough to start

Hours
Mon–Fri 7am–5pm, Sat by arrangement
Service area
Belconnen · Gungahlin · North Canberra · South Canberra · Woden Valley · Weston Creek · Molonglo Valley · Tuggeranong

Preparing the security check…